{"id":3329,"date":"2021-07-08T14:30:17","date_gmt":"2021-07-08T12:30:17","guid":{"rendered":"https:\/\/www.dhtc.nl\/?p=3329"},"modified":"2023-11-02T10:51:23","modified_gmt":"2023-11-02T09:51:23","slug":"larger-and-more-economical-safety-first","status":"publish","type":"post","link":"https:\/\/www.dhtc.nl\/en\/larger-and-more-economical-safety-first\/","title":{"rendered":"Larger and more economical? Safety First"},"content":{"rendered":"<p>Five years ago, the Gemini wind farm, 55 km north of Schiermonnikoog was completed. The park has 150 wind turbines with a capacity of 4 megawatts each. Last year wind park Borssele 1 &amp; 2 was completed off the Zeeland coast with 8 megawatt turbines. Technology is rapidly developing, turbines are growing in size, companies are now building with turbines of up to 11 megawatts, like wind farm \u2018Hollandse Kust Zuid\u2019. The rotor of a turbine is about 100 meters long: A rotating soccer field. Wind farm Hollandse Kust Zuid has a capacity of 1500 megawatts. At the moment, the first foundations are being put on the North Sea. A tough job.<\/p>\n<h3>Safety First<\/h3>\n<p>Of course the work needs to be done completetely safely and free of risk. In the offshore, almost everything is by definition large, heavy and therefore potentially risky.That is why safety is being stressed: in that matter offshore wind does not differ much from the oil- and gas industry, where the \u2018Safety First\u2019 motto counts.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2796 size-news_image\" src=\"https:\/\/www.dhtc.nl\/wp-content\/uploads\/2017\/04\/DHTC-GWO-Certified-training-2017-Peter-van-Aalst-800x420.jpg\" alt=\"Transition Piece \" width=\"800\" height=\"420\" srcset=\"https:\/\/www.dhtc.nl\/wp-content\/uploads\/2017\/04\/DHTC-GWO-Certified-training-2017-Peter-van-Aalst-800x420.jpg 800w, https:\/\/www.dhtc.nl\/wp-content\/uploads\/2017\/04\/DHTC-GWO-Certified-training-2017-Peter-van-Aalst-300x158.jpg 300w, https:\/\/www.dhtc.nl\/wp-content\/uploads\/2017\/04\/DHTC-GWO-Certified-training-2017-Peter-van-Aalst-768x403.jpg 768w, https:\/\/www.dhtc.nl\/wp-content\/uploads\/2017\/04\/DHTC-GWO-Certified-training-2017-Peter-van-Aalst-1024x538.jpg 1024w, https:\/\/www.dhtc.nl\/wp-content\/uploads\/2017\/04\/DHTC-GWO-Certified-training-2017-Peter-van-Aalst.jpg 1200w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/p>\n<h3>DHTC Safety training for the wind industry for 15 years \u2013 GWO BST<\/h3>\n<p>Based on decades of training experience in safe working at sea, DHTC has been active for 15 years with training programs specifically developed for the wind industry. DHTC offers 4 modules of the GWO Basic Safety Training in a 4-day training in which the following topics are discussed in greater depth: Sea Survival, Manual Handling, Fire Awareness and First Aid.<\/p>\n<h3>GWO Certified<\/h3>\n<p>Our trainings are certified by the <a href=\"https:\/\/www.globalwindsafety.org\/\" target=\"_blank\" rel=\"noopener\">Global Wind Organization<\/a> (GWO), a guarantee for participants to apply their skills and certificates to the wind industry worldwide. GWO is a non-profit organization founded by wind turbine manufacturers and owners. An injury-free working environment is pursued, with common international standards for safety training and emergency procedures.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3339 size-full\" src=\"https:\/\/www.dhtc.nl\/wp-content\/uploads\/2021\/07\/DHTC-GWO-Transfer-Boat-TP2.jpg\" alt=\"Safety First\" width=\"692\" height=\"400\" srcset=\"https:\/\/www.dhtc.nl\/wp-content\/uploads\/2021\/07\/DHTC-GWO-Transfer-Boat-TP2.jpg 692w, https:\/\/www.dhtc.nl\/wp-content\/uploads\/2021\/07\/DHTC-GWO-Transfer-Boat-TP2-300x173.jpg 300w\" sizes=\"auto, (max-width: 692px) 100vw, 692px\" \/><\/p>\n<p>In our GWO Basic Safety Training participants are practiced in the most realistic way (see pictures) in the essential skills that are necessary for safe working in this sector. On our website <a href=\"https:\/\/www.dhtc.nl\/en\/\">DHTC.com<\/a> you can read more about our GWO trainings and you\u2019ll find the training that fits your needs.<\/p>\n<p>We are happy to accommodate your booking!\u00a0 Of course it is also possible to schedule dates at your request (groups).<\/p>\n<p><a href=\"https:\/\/www.dhtc.nl\/en\/courses\/gwo-offshore-wind\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3386\" src=\"https:\/\/www.dhtc.nl\/wp-content\/uploads\/2021\/07\/GWO_Certified_Training_Provider_2021_RGB_BLUE.png\" alt=\"\" width=\"150\" height=\"63\" srcset=\"https:\/\/www.dhtc.nl\/wp-content\/uploads\/2021\/07\/GWO_Certified_Training_Provider_2021_RGB_BLUE.png 1023w, https:\/\/www.dhtc.nl\/wp-content\/uploads\/2021\/07\/GWO_Certified_Training_Provider_2021_RGB_BLUE-300x127.png 300w, https:\/\/www.dhtc.nl\/wp-content\/uploads\/2021\/07\/GWO_Certified_Training_Provider_2021_RGB_BLUE-768x325.png 768w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Five years ago, the Gemini wind farm, 55 km north of Schiermonnikoog was completed. The park has 150 wind turbines with a capacity of 4 megawatts each. Last year wind park Borssele 1 &amp; 2 was completed off the Zeeland coast with 8 megawatt turbines. Technology is rapidly developing, turbines are growing in size, companies [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,29],"tags":[43,73,51],"class_list":["post-3329","post","type-post","status-publish","format-standard","hentry","category-bedrijfsnieuws","category-corporate","tag-den-helder","tag-gwo","tag-training"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/posts\/3329","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/comments?post=3329"}],"version-history":[{"count":33,"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/posts\/3329\/revisions"}],"predecessor-version":[{"id":3976,"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/posts\/3329\/revisions\/3976"}],"wp:attachment":[{"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/media?parent=3329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/categories?post=3329"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dhtc.nl\/en\/wp-json\/wp\/v2\/tags?post=3329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}